User Tools

Site Tools


bayes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
bayes [2014/08/22 14:27]
wphase
bayes [2017/07/13 11:44] (current)
wphase
Line 1: Line 1:
 ====== Project BAYES ====== ====== Project BAYES ======
  
-  * [[bayes:​description|Project description]] +  * [[bayes:​description|Description]] 
-  * [[bayes:​cluster|Cluster configuration]] +  * [[bayes:​cluster|Computational resources]] 
-  * [[bayes:earthquakes|Earthquakes]]+  * [[bayes:problems|Problems (private)]] 
 +  * [[bayes:​toy|Toy models (private)]] 
 +  * [[bayes:​bib|Bibliography (private)]] 
 +  * [[bayes:​altar|AlTar (private)]]
  
 ------- -------
Line 17: Line 20:
   * Romaric David, Pôle HPC - Université de Strasbourg   * Romaric David, Pôle HPC - Université de Strasbourg
   * Fernando Niño, LEGOS - CNRS - Université Paul Sabatier   * Fernando Niño, LEGOS - CNRS - Université Paul Sabatier
- 
- 
-------- 
- 
-==== GPU nodes - Mésocentre de l'​Université de Strasbourg ==== 
- 
-== Current configuration == 
-  * publicgpu or grantgpu queue: 
-    * 2 nodes with 4 K20 GPU cards 
-    * 1 nodes with 2 K20 and one K40 GPU card 
-  * public queue: 
-    * M2050, M2070 and K20 GPUs. 
- 
-== Planned configuration (28 GPUs) == 
-  * Must be compatible with existing NEC nodes of the HPC cluster 
-  * The GPUs must be able to host G and M matrices larger than 5GB. 
-  * 6 compute nodes 
-    * 4 GPU NVIDIA K40 per node (total: 24 GPUs) 
-    * Each GPU will have its own dedicated PCI-E slot 
-  * 4 GPU cards to be installed on existing nodes (2 GPU/node) 
-    * NVIDIA K40 
-    * Each GPU card will have its own dedicated PCI-E slot 
-  * We also request 3 years of software and hardware support 
-  * Budget: 147 000 euros VAT included 
-  * Currently working with Transtech, Nec and Dell for pre-pricings : 
-    * Nec/​Transtech working on the same nodes as the ones installed 
-    * Dell working on a solution based on a C8000 chassis and C8220x nodes. If the C8000 chassis is full, could be the same density as the NEC nodes. Otherwise may be less interresting 
- 
  
 ------- -------
Line 53: Line 28:
     * PI: Z. Duputel (Strasbourg)     * PI: Z. Duputel (Strasbourg)
     * project: Bringing a Bayesian Perspective to Large Dimensional Problems in Geophysics and Astrophysics     * project: Bringing a Bayesian Perspective to Large Dimensional Problems in Geophysics and Astrophysics
 +  * CNRS project: PICS 2015-2017
 +    * 6 000 euros/year
 +    * PI: Z. Duputel (Strasbourg) and M. Simons (Caltech)
 +    * Project: Utilisation de méthode Bayésiennes pour l'​étude des séismes
   * CNRS INSU project: Terre Solide (ALEAS) 2014   * CNRS INSU project: Terre Solide (ALEAS) 2014
     * 6 000 euros      * 6 000 euros 
Line 59: Line 38:
  
 ------- -------
- 
- 
bayes.1408710440.txt.gz · Last modified: 2014/08/22 14:27 by wphase